Roadmap
What the site publishes today and what remains out of scope.
What exists
The specification is on this site. Each item is a link, not a restated table.
What does not
- Authorship of the AI9GM specification: v0.9 is adopted input and this site does not edit it.
- Conducting the evidence programme: the site frames it and running it is not a build activity.
- ai9gm.org, and any community, contribution or forum feature.
- Certification, training, accreditation or assessment schemes of any kind.
- Case studies.
- The lifecycle overlay and the action surface overlay, both deferred to v1.0.
- Gated content of any kind, email capture as a precondition for reading and visitor counts reported on the site.
- Search as a build item.
- Phase 6 decision notes, which are worked examples gated on KL-01a.
Intent for ai9gm.org
ai9gm.org is secured and unimplemented. It is aspirational.
Community language stays in the future tense until that site exists.
Evidence programme
The v1.0 evidence programme is two implementations within twelve months from publication of v0.9. It exists to produce the evidence the specification does not have.
The organization receives an implementation of the framework at no fee.
The framework receives permission to publish findings. Whether those findings are named or anonymized is the organization's choice, made after they see the findings.
The programme is not a certification and not an endorsement. Findings are implementation records conducted by the framework's author. They are not case studies.
Known limitations
AI9GM has known limitations. They are refined as the specification is used.
When an item closes, the change is written into the specification. The detailed register is not on this page yet.
Independent stewardship
Independent stewardship is an intention. It is not a fact.